NOTE - Remove cores from service valves if not already done.
OUTDOOR UNIT
VACUUM PUMP
NITROGEN
C- Refrigerant Charge
The ELXP units have a factory holding charge of 2 pounds
of HFC-410A in each circuit. Additional refrigerant will
need to be added during installation. Charge using the
HFC-410A charging information label provided in the unit.
The HFC-410A charging information label in the unit ap-
plies to Indoor and Outdoor unit with same full load ca-
pacity, see table below. For all other unit matches, please
contact Commercial Application department for Charging
Procedure Information (form # 508349-01).
V- SEQUENCE OF OPERATION
COOLING MODE
First Stage Cooling Call
Y1 thermostat demand from Air handler energizes 24VAC
signal to TB14-C1 connection.
TB14-C1 voltage energizes CMC1-O terminal. CMC1 de-
frost board energizes the L1 reversing valve solenoid.
TB14-C1 voltage passes through N.C. K8-2 contacts en-
ergizing CMC1-Y1 terminal.
CMC1 energizes the CMC1-Y1 OUT terminal energizing
the K1 compressor contactor (assuming S87 low pres-
sure switch and S4 high pressure switch remain closed).
Then, energized CMC1-Y1 OUT voltage passes through
CMC1 N.C. fan relay energizing K10 fan relay.
K1-1 closes, energizing B1 compressor on low speed.
K1-2 opens to de-energize HR1 crankcase heater.
K10-1 closes, energizing outdoor fan B4 and B5.
NOTE – When high voltage power is applied to unit, K1-2
N.C. energizes HR1 crankcase heater.
MICRON GAUGE
A34000 1/4 SAE
TEE WITH
A
SWIVEL
COUPLER
C
B
D
A
Connect low side of manifold gauge set with 1/4 SAE in-line tee to suction line
service valve
B
Connect high side of manifold gauge set to liquid line service valve
C
Connect micron gauge available connector on the 1/4 SAE in-line tee.
HFC-410A
D
Connect the vacuum pump (with vacuum gauge) to the center port of the
manifold gauge set. The center port line will be used later for both the
HFC-410A and nitrogen containers.
FIGURE 10
Page 13
50
TO SUCTION
SERVICE VALVE
Second Stage Cooling Call
Y2 thermostat demand from Air handler energizes 24VAC
signal to TB14-C2 connection.
TB14-C2 signal passes though K8-3 N.C. energizing K67
Stage 2 Relay.
K67-1 closes, energizing L34 Solenoid shifting B1 com-
pressor to high speed.
HEATING MODE
Heating Call
W1 thermostat demand from air handler energizes 24VAC
signal to TB14-H1 connection.
TB14-H1 signal energizes K8 transfer relay.
K8-2 closes, energizing CMC1-Y1 terminal.
CMC1 energizes the CMC1-Y1 OUT terminal energizing
the K1 compressor contactor (assuming S87 low pres-
sure switch and S4 high pressure switch remain closed).
Then, energized CMC1-Y1 OUT voltage passes through
CMC1 N.C. fan relay energizing K10 fan relay.
K1-1 closes, energizing B1 compressor on low speed.
K1-2 opens to de-energize HR1 crankcase heater.
K10-1 closes, energizing outdoor fan B4 and B5.
K8-3 closes, energizing K67 Stage 2 relay.
K67-1 closes, energizing L34 solenoid shifting B1 com-
pressor to high speed.
NOTE – When high voltage power is applied to unit, K1-2
N.C. energizes HR1 crankcase heater.
MANIFOLD
GAUGE SET
TO LIQUID
LINE SERVICE
VALVE
RECOMMEND MINIMUM
3/8" HOSE