Allied Systems LONG REACH CCHA Panduan Pemeliharaan dan Servis Instalasi - Halaman 2

Jelajahi secara online atau unduh pdf Panduan Pemeliharaan dan Servis Instalasi untuk Peralatan Industri Allied Systems LONG REACH CCHA. Allied Systems LONG REACH CCHA 19 halaman. Carton clamp with load stabilizer

3
4
3.1 Safety Information .........................................5
3.2 Safety Regulations ........................................5
3.3 Safety Symbols .............................................5
3.4 Labeling ........................................................6
3.5 Training..........................................................6
3.6 Personnel Safety ...........................................6
3.7 Pre-start Checks ...........................................7
3.8 Operation Warnings ......................................7
3.9 Hydraulic Hazards .......................................7
3.10 Electrical Hazards .......................................7
2

TABLE OF CONTENTS

3.11 Maintenance Warnings ...............................8
3.12 Load Handling ............................................8
3.13 Load Positioning .........................................9
3.14 Operator's Controls ...................................9
3.15 Industry Standards ...................................10
3.16 Clamp Open Control .................................10
4.1 Truck Requirements ....................................12
4.2 Attachment Installation ...............................12
4.5 Hydraulic Connections ................................13
5.1 Attachment Removal ..................................14
5.2 Arm Removal ..............................................14
5.3 Arm Installation ...........................................14
5.4 Cylinder Removal .......................................14
5.5 Cylinder Installation ....................................14
5.6 Cylinder Disassembly .................................15
5.7 Cylinder Inspection .....................................16
5.8 Cylinder Assembly ......................................16
5.9 Hydraulic Valve Removal ............................17
5.10 Hydraulic Valve Installation .......................17
5.11 Camber Adjustment ..................................17
5.12 Toe Adjustment ........................................18
5.13 Rotating Contact Pads ..............................18
6.1 Schedule .....................................................19
6.2 Torque Specifications ..................................19
45-034, REV. 5/18