CPI R900 Instal Manual - Halaman 3

Jelajahi secara online atau unduh pdf Instal Manual untuk Validator Catatan Bank CPI R900. CPI R900 7 halaman.

CPI R900 Instal Manual
Bezel LED Error flash code
Refer to the Bezel LED to identify the bill validator status.
The Bezel LED indicates the state of the bill validator by using lighting patterns.
Bezel Lamp
Flashing in Green
Every 0.3s, 2 times,
Repetition
Flashing in Green
Every 0.3s, 5 times
Flashing in Green
Every 0.5s
ON in Red
OFF
Phase2 - R900 Installation Guide (V1.1 2020-04-16).docx
State
Stand-by
Upon power-on, when the
initial cycle is completed,
Active
the lamp operates one-
High-Security
Mode
to indicate in high-security
In Cleaning Mode
cleaning sheet to clean-up
Not ready to accept the
Not Ready
Please refer to monitor
lamp to see BV status
No Power
Communication Error
Inhibited All Bills
Check DIP SW setting
Bill is in Inlet Sensor
Pull out the returned bill
Busy (in validation)
Abnormal State
Description
Ready to accept
the inserted bills
flash cycle in Green
(0.3s, 5 times)
mode
Ready to be inserted
the bill path
inserted bills
Turn on Power
Check connector
---
Check BV status
Bezel LED