Dell EMC ScaleIO Ready Node 14G Panduan Inspeksi - Halaman 3

Jelajahi secara online atau unduh pdf Panduan Inspeksi untuk Server Dell EMC ScaleIO Ready Node 14G. Dell EMC ScaleIO Ready Node 14G 8 halaman.

Dell EMC ScaleIO Ready Node 14G Panduan Inspeksi

Introduction

Hardware Installation Checklist

{ }
Braces enclose content that the user must specify, such as x or y or
z
...
Ellipses indicate nonessential information omitted from the example
Where to get help
EMC support, product, and licensing information can be obtained as follows:
Product information
For documentation, release notes, software updates, or information about EMC
products, go to EMC Online Support at https://support.emc.com.
Technical support
Go to EMC Online Support and click Service Center. You will see several options
for contacting EMC Technical Support. Note that to open a service request, you
must have a valid support agreement. Contact your EMC sales representative for
details about obtaining a valid support agreement or with questions about your
account.
Your comments
Your suggestions will help us continue to improve the accuracy, organization, and
overall quality of the user publications. Send your opinions of this document to
This document provides an overview of the inspection process for ScaleIO Ready
Node servers.
When the node is powered on, the front panel blue LED should light up and be steady.
In addition, neither the power supplies nor drives should have any amber LEDs lit.
If the front panel LEDs are either blinking or colored amber, or if the drives light up an
amber LED, use the information in the following sections to check the nodes. The
sensor information and the Event log information are available via the BMC. You can
access the information on the drives from the PERCCLI utility.
Before you begin, ensure that you know the IP address of the BMC (iDRAC) port on
the server.
Perform the following steps to inspect a server:
Check the hardware installation.
l
Check the sensors.
l
Enable the disk utility.
l
Verify the drive status.
l
Prepare the hardware for failure analysis, if necessary.
l
This section includes a hardware checklist to be used by the CE.
It is the CE's responsibility to complete this checklist.
Customer Name:
Customer Location:
Server Inspection Guide
CE Name:
Introduction
3