Dell PowerEdge 2550 Petunjuk Pemasangan Rak - Halaman 21

Jelajahi secara online atau unduh pdf Petunjuk Pemasangan Rak untuk Server Dell PowerEdge 2550. Dell PowerEdge 2550 40 halaman. Wake-on-lan (wol) support on dell servers
Juga untuk Dell PowerEdge 2550: Panduan Instalasi (26 halaman), Instal Manual (32 halaman), Panduan Konfigurasi (10 halaman), Panduan Aktivasi (32 halaman), Panduan Instalasi (32 halaman), Manual (28 halaman), Manual (15 halaman)

Dell PowerEdge 2550 Petunjuk Pemasangan Rak
F i g u r e 1 - 1 1 . I n s t a l l i n g t h e S l i d e A s s e m b l i e s f o r C e n t e r - M o u n t
C o n f i g u r a t i o n
12-24 x 0.5-inch
Phillips screw
(2 per bracket)
shoulder
washer
(2 per bracket)
locking nut
(2 per bracket)
Flush-Mount Installation
To prepare the RapidRails slide assemblies for flush-mount installation in the 2-post rack,
perform the following steps:
Locate the left slide assembly and place it on a smooth work surface. Place the right
1
slide assembly to the right of the left slide assembly. Position both rails so that the
center brackets are facing upwards.
NOTE: The slide assemblies are factory configured for center-mount use. For flush-mount
installation, you must remove, rotate 180 degrees, and reinstall the mounting bracket on
the opposite slide assembly.
Remove two locking nuts and two shoulder washers from each center bracket.
2
right slide
assembly
Ra c k In s ta l lati on Gui de
1-15