Dell PowerEdge systems 6300 Pemasangan Rak - Halaman 31

Jelajahi secara online atau unduh pdf Pemasangan Rak untuk Server Dell PowerEdge systems 6300. Dell PowerEdge systems 6300 34 halaman. Systems 1 x 2 backplane
Juga untuk Dell PowerEdge systems 6300: Informasi Instalasi (6 halaman), Panduan Instalasi (28 halaman), Pemasangan Rak (37 halaman), Panduan Pengguna (42 halaman), Instal Manual (8 halaman), Panduan Petunjuk Instalasi (12 halaman), Manual Penggantian (3 halaman), Informasi Instalasi (6 halaman)

Dell PowerEdge systems 6300 Pemasangan Rak
(Rev. 9/8/00) FILE LOCATION: S:\SYSTEMS\MARCONI\Rackingd\7U\05KCEa00\05KCEeb0.fm
support.dell.com

Reversing the Cable-Management Arm Installation

1.
Turn the cable-management arm over (see Figure 13).
pull pin
offset
hinge
rail-mounting
plate
Figure 13. Reversing the Cable-Management Arm
2.
Remove the pull pins from the offset hinge of the cable-management arm.
3.
Remove the rail-mounting plate.
NOTE: Make note of the orientation of the rail-mounting plate to the vertical rail.
4.
Pull the hinge away from the cable-management arm assembly.
5.
Position the offset hinge next to the cable-management arm assembly.
6.
Replace the pull pin with the ring facing up.
7 .
Replace the rail-mounting plate in the same orientation to the opposite vertical
rail.
8.
Replace the second pull pin with the ring facing up.
9.
Perform the steps to install the cable-management arm. The opposite vertical rail
and the slotted pocket on the opposite side of the cable tray are used for reverse
the installation of the cable-management arm.
DELL CONFIDENTIAL - Preliminary
latch pin
9/8/00
Rack Installation Guide
17