Dell Precision Workstation 350 Panduan Instalasi - Halaman 29

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Server Dell Precision Workstation 350. Dell Precision Workstation 350 32 halaman. Dell poweredge 350 servers: supplementary guide
Juga untuk Dell Precision Workstation 350: Pembaruan Informasi (30 halaman)

Dell Precision Workstation 350 Panduan Instalasi
support.dell.com
captive
fastener

Figure 1-20. Installing the Cable-Management Arm

2.
Align the free end of the cable-management arm (the end with the pin and cap-
tive thumbscrew) to the back end of the right (or left) side inner rail (as viewed
from the back) of the system.
3.
Secure the cable-management arm to the inner rail with the captive thumbscrew
(see Figure 1-20).
4.
Attach the input/output (I/O) cables to their respective expansion cards on the
back of the system.
5.
Connect the remaining cables to the system.
For details, see your system's Installation and Troubleshooting Guide and User's
Guide.
6.
Secure the cables to the cable-management arm:
a.
After connecting the cables to the system, unscrew the thumbscrews that
secure the front of the server to the front vertical rail.
b.
Slide the system forward to the fully extended position.
c.
Route the cables along the cable-management arm, allowing some additional
cable slack at the hinge positions, and secure the cables to the cable-
management arm with the Velcro straps attached to the cable-management
arm.
pin
Rack Installation Guide
1-23