EarthLinked ACM-1836A Panduan Instalasi - Halaman 8
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Pendingin Udara EarthLinked ACM-1836A. EarthLinked ACM-1836A 11 halaman. Auxiliary cooling module
Figure 4. Top View of Line Set Connections
All refrigerant piping joints and connections in the EarthLinked® heating and cooling system,
including the Auxiliary Cooling Module, line sets and earth loop system are to be brazed with
15% silver content brazing alloy, utilizing the NITROGEN BRAZING PROCESS.
ACM-22CP-IM (05/13)
Page 8