Ensy AHU Series Prosedur Startup - Halaman 2

Jelajahi secara online atau unduh pdf Prosedur Startup untuk Kipas angin Ensy AHU Series. Ensy AHU Series 8 halaman.

Ensy AHU Series Prosedur Startup
393803‐2 Startup procedure for EnSy AHU units
Information can be found on the data plaque inside the unit.    This sign shows. AHU‐400 BH 
 
Unit type: AHU‐_____________  
 
Serial no: 010_________   _____. ____  /  _____ 
 
Date of
start up
first
time: ___________ 
 
Where the unit is installed: 
 
Name: ____________________________________________________ 
 
Address: __________________________________________________ 
 
 
 
 
Here are some points to be checked after Ensy® AHU unit is 
installed. 
 
1. Insert the plug into a grounded socket.  
Then you will have a picture like this in display. 
(Time and temperatures will show other values then shown here) 
 
 
 
 
 
 
2. Control to see if there are contact between Display and Master 
software in unit. 
 
Press control button 3 once to get into the information menu. 
Press control button 3 once to get into the Program version menu. 
Press (Enter) control button 4. 
You than will see that there are contact with Display and Mastercard software in menu picture (3.2).  
Press control button 1 (Return) twice to get back to start up menu. 
 
Note! If you have installed an extra display then you have to program one of the displays with 
name Display 2. (Both displays must have same software version.) 
Press control button 4 once to get into 4. Preferences.   
Press control button 3 four times to get to Setup. 
Press (Enter) control button 4 to get into 4.5 PIN code.   
We reserve the right to change technical data without notice     http://www.ensy.no 
REV:0_08.09.2016. KJK 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
            
 
Controll button 1.
2.
3. 
      Overview push buttons. 
Latest display 
software are 021 and 
Master are 034. 
     
 
 
 
Fill in three last numbers: 
 
Display 1 Ver: _________ 
 
Display 2 Ver: _________ 
 
Master Ver: ___________ 
 4. 
               
Page 2