Dell EMC PowerSwitch S5148F-ON Setup Manual - Halaman 14

Jelajahi secara online atau unduh pdf Setup Manual untuk Beralih Dell EMC PowerSwitch S5148F-ON. Dell EMC PowerSwitch S5148F-ON 20 halaman.
Juga untuk Dell EMC PowerSwitch S5148F-ON: Panduan Instalasi (45 halaman)

Dell EMC PowerSwitch S5148F-ON Setup Manual
Figure 6. Four-post threaded installation
2. For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end.

S5148F-ON installation

For the 1U two-post configurations, slide the switch into the rails in the same manner as the four-post configurations.

1U front-rack installation

Configure the rails that are attached to the switch.
1.
NOTE:
For more information, see the installation instruction labels on the rail.
Attach the inner switch rails to the S5148F-ON switch.
Line up the rail with the mounting heads and attach the rail to the chassis. Slide the rail back until it locks into place. The
following shows the detail of the front standoff with the locking tab:
14
S5148F-ON switch Installation