Dell Networking S5000 Panduan Instalasi - Halaman 24

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Beralih Dell Networking S5000. Dell Networking S5000 50 halaman. Data center switch
Juga untuk Dell Networking S5000: Panduan Konfigurasi (12 halaman), Panduan Konfigurasi (17 halaman), Panduan Memulai (37 halaman)

Dell Networking S5000 Panduan Instalasi

Installing the S5000 Chassis into a 4-Post Rack or Cabinet

NOTE: Dell Networking recommends that one person hold the S5000 chassis in place while a second person
attaches the brackets to the posts.
Attach the bracket "ears" to the rack or cabinet posts, using two screws for each bracket. Ensure the screws are
tightened firmly.
Figure 10. Front Rack Installation
1. Screws
2. 4–Post Rack or Cabinet
3. Mounting Bracket

Rack Grounding

When you prepare your equipment rack, ensure that the rack is earth ground. You must ground the equipment rack to
the same ground point the power service uses in your area. The ground path must be permanent.

Important Points to Remember for Installing an Ethernet Module

Installing and swapping of Ethernet modules must be done BEFORE power up. If you need to install or replace a
module, power down the system before you install or replace it. If you install or replace a module when the
system is powered up, the system does not recognize the module. Online insertion of modules can result in a
catastrophic failure.
Although the handle and port numbering may appear differently on an Ethernet module, there is no functional
difference. A module may have:
A larger handle that covers the entire front of the module and has the part number written on top of the
handle. Port numbering is written on the front of the handle.
24