Christian Vogel BATWING Panduan Perakitan - Halaman 6

Jelajahi secara online atau unduh pdf Panduan Perakitan untuk Pesawat terbang Christian Vogel BATWING. Christian Vogel BATWING 19 halaman.

Now put white glue on the long sides of the two components S1. Subsequently, the two components S1 are
pressed together with the central Carbon rod on one of the two jaw strips and connected to the second jaw
ledge to a rectangular box.
Please remove excess white glue, as protruding adhesive tabs make it difficult to insert the wingjoiner box
into the ribslater during construction.
In order to ensure the dimensional accuracy of the entire connection, the components S2 are now pushed
over the box construction and fixed with clothespins during the drying phase. Here it is advisable to align all
components flush on one side ...
The S2 components are not glued to the remaining wingjoiner box!
If you are unsure about gluing the plug-in box, you can lubricate the CFK plug with oil to be on the safe side.
As a result, an adhesion of the carbon rod to the connector box can be largely avoided. After drying, the
components S2 are removed again from the plug-in box.
As a final processing step is now still the preparation of the two outer rib R14 with the gluing the plastic nuts
on. The nuts are used to attach the removable winglets.
6