Dell PowerSwitch S4128T-ON Panduan Instalasi - Halaman 27
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Beralih Dell PowerSwitch S4128T-ON. Dell PowerSwitch S4128T-ON 49 halaman.
Figure 19. Two-post center-mount installation
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3.
3. Repeat this procedure for the second rail.
Four-post threaded installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1. Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a
Torx driver.
Retain the latch castings for future rack requirements.
S4100–ON Series installation
27