Dell S4048T-ON Panduan Memulai - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Memulai untuk Beralih Dell S4048T-ON. Dell S4048T-ON 35 halaman.

Dell S4048T-ON Panduan Memulai
Figure 3. Assembly to S4048T-ON PSU-side attachment
CAUTION:
Take care not to damage the attached ground wire as you proceed to
install the switch.
After the switch is installed in the rack, see
ReadyRails installation
The ReadyRails rack mounting system is provided to easily configure your rack so that you
can install your switch.
Use the Dell ReadyRails™ system in 1U front-rack and two-post installations. The ReadyRails
system includes two separately packaged rail assemblies and two rails that are shipped
attached to the sides of the switch. Install the ReadyRails system using the 1U tool-less
method or one of three possible 1U tooled methods—two-post flush mount, two-post
center mount, or four-post threaded.
CAUTION:
Your system is not NEBS Earthquake Z4-compliant if you use the 1U tool-
less square-hole or two-post installation methods.
CAUTION:
Do not use the mounted ReadyRails as a shelf or a workplace.
NOTE:
The illustrations in this document are not intended to represent a specific
switch.
Ground wire
installation.
Hardware installation
11