Dell S4100-ON Series Setup Manual - Halaman 15
Jelajahi secara online atau unduh pdf Setup Manual untuk Beralih Dell S4100-ON Series. Dell S4100-ON Series 21 halaman.
Juga untuk Dell S4100-ON Series: Panduan Instalasi (47 halaman), Panduan Instalasi (48 halaman), Panduan Instalasi (49 halaman)
Figure 6. Four-post threaded installation
2
For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end.
S4100-ON Series system installation
You can mount the system in the 1U front-rack two-post, flush, or center configuration or a four-post configuration. The following is an
example of a front-rack configuration:
For the 1U two-post configurations, slide the system into the rails in the same manner as the four-post configurations.
1U front-rack installation
Configure the rails that are attached to the system.
1
NOTE:
For more information, see the installation instruction labels on the rail.
Attach the inner switch rails to the S4100–ON Series switch.
Line up the rail with the mounting heads and attach the rail to the chassis. Slide the rail back until it locks into place. The following
shows the detail of the front standoff with the locking tab:
S4100–ON Series installation
15