Dell S4248FBL-ON Panduan Instalasi - Halaman 24

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Beralih Dell S4248FBL-ON. Dell S4248FBL-ON 47 halaman. S4200-on series
Juga untuk Dell S4248FBL-ON: Setup Manual (29 halaman)

Dell S4248FBL-ON Panduan Instalasi
Figure 12. Two-post center-mount threaded round-hole installation
2
Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, see items 2 and 3.
3
Repeat this procedure for the second rail.

Four-post threaded installation

NOTE:
To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
For this installation, remove the tool-less latch castings from the front side of each ReadyRails assembly, see item 1.
Use a Torx screwdriver to remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch
casting. Retain the castings for future rack requirements.
24
S4200-ON Series installation