AW AV-ACC-MK Pengoperasian Manual - Halaman 2

Jelajahi secara online atau unduh pdf Pengoperasian Manual untuk Alat Ukur AW AV-ACC-MK. AW AV-ACC-MK 3 halaman.

AW AV-ACC-MK Pengoperasian Manual
SETTING UP YOUR ONE TOUCH ACTION:
1. Connect Port 1 to regulated air supply.
2. Connect Port 2 to left Port on Vise Base.
3. Connect Port 4 to right Port on Vise Base.
AIR VISE & WORKHOLDING
11350 W Executive Dr.
Boise, ID 83713
WWW.AIRVISE.COM | [email protected] | 208-918-8473
Your operations kit and vise are set
up and connected. You can begin
to actuate the jaws. Make sure the
vise has regulated air supply. Adjust
the regulator's PSI to the desired
clamping force.
ACC-MK-ID19
AIR VISE & WORKHOLDING
Air flow thru regulator
WWW.AIRVISE.COM
208-918-8473