360 Yield 360 Y-DROP HAGIE DELTA BOOM Buku Petunjuk - Halaman 5
Jelajahi secara online atau unduh pdf Buku Petunjuk untuk Peralatan Pertanian 360 Yield 360 Y-DROP HAGIE DELTA BOOM. 360 Yield 360 Y-DROP HAGIE DELTA BOOM 11 halaman.
INSTALL CENTER SECTION
III.
SQUARE TUBE UPGRADE
Figure 6
Step 1
Place top plate (1) on top of the center
section and install two bolts (2) with
washers and carriage bolts (3). Note the
carriage bolt at the rear of the boom will
need to be set in place on the 14" top
plate before it is installed in Step 2.
Figure 7
Step 2
Place 14" top plate (1) and bracket
assemblies (2) into position, then install
four flange nuts (3).
Step 3
Install extension tube (4) onto bracket
assembly (2).
Step 4
Install boom bracket (5).
Figure 8
Step 5
Install stainless steel set screw (1) and
the jam nut assembly onto both OEM
bracket assembly and Y-DROP boom
bracket assembly.
Step 6
Install square U-bolt (2), the 5/16" extra
thick washers and the 5/16" nuts.
Hardware Kit A
Repeat steps 1-6 for second center section mount.
INSTRUCTIONS 360 Y-DROP
2
3
Figure 6
Figure 7
2
1
Figure 8
Figure9
360YIELDCENTER.COM
HAGIE DELTA BOOM
1
5
4
1
3
2
5