360 Yield 360 Y-DROP HAGIE DTS 2016 + Buku Petunjuk - Halaman 4

Jelajahi secara online atau unduh pdf Buku Petunjuk untuk Peralatan Pertanian 360 Yield 360 Y-DROP HAGIE DTS 2016 +. 360 Yield 360 Y-DROP HAGIE DTS 2016 + 10 halaman.

INSTALL PRIMARY BOOM SPRAYER
II.
MOUNT PACKAGE
Figures 4
To prepare for the steps that follow, you will need
to drill two 7/16" holes at mounting location 1 (40"
+/-5" from the pivot pin) on both OEM Primary
booms. This will allow for the installation of the
first mounting position of the square U-bolt on the
front and rear OEM booms.
Figures 5 and 6
Step 1
With the thread pointing down, install
square U-bolts (1) on the top of the OEM
primary boom.
Bag AF (2.0")
Bag AG (2.5")
Step 2
Install bracket assemblies (2) and the
flange nuts.
Hardware Kit D
Figure 7
Step 3
Install extension tube (3).
Step 4
Install boom bracket (4) onto extension
tube (3).
Repeat Steps 1-4 for the remaining mounting
positions on the primary booms.
INSTRUCTIONS 360 Y-DROP
Figure 4
2.5"
2.5"
Figure 5
2
1
2
Figure 6
4
Figure 7
360YIELDCENTER.COM
HAGIE DTS 2016 +
2.0"
2.0"
2.0"
1
3
4