360 Yield 360 Y-DROP JOHN DEERE 4710 Buku Petunjuk - Halaman 4

Jelajahi secara online atau unduh pdf Buku Petunjuk untuk Peralatan Pertanian 360 Yield 360 Y-DROP JOHN DEERE 4710. 360 Yield 360 Y-DROP JOHN DEERE 4710 12 halaman.

INSTALL MOUNT ASSEMBLIES
II.
ON THE OEM PRIMARY BOOM
Figure 4
Step 1
With the threads pointing down, install
U-bolt (1) on the top of the OEM
primary boom.
Bag AD
Step 2
Install bracket assembly (2) and flange
lock nut (3).
Hardware Kit D
Step 3
Install extension tube (4).
Figure 5
Step 4
Install boom bracket (1) onto the

extension tube.

Step 5
Install stop bolts (2) at both the front
and the rear of the extension tube.
Hardware Kit B
Figure 6
Step 6
Install stainless steel set screw and
jam nut assembly (1) onto the bracket
assembly.
Hardware Kit D
Repeat Steps 1-6 for the remaining mount assemblies
on the OEM primary boom.
INSTRUCTIONS 360 Y-DROP
2
Figure 4
1
2
Figure 5
1
Figure 6
360YIELDCENTER.COM
JOHN DEERE 4710
1
3
4
1
4