Miele AWG 102 Petunjuk Pengoperasian dan Pemasangan - Halaman 16

Jelajahi secara online atau unduh pdf Petunjuk Pengoperasian dan Pemasangan untuk Kap Ventilasi Miele AWG 102. Miele AWG 102 28 halaman. External motor roof installation
Juga untuk Miele AWG 102: Panduan Pengoperasian dan Instalasi (24 halaman), Panduan Petunjuk Instalasi (28 halaman), Panduan Petunjuk Instalasi (28 halaman)

Miele AWG 102 Petunjuk Pengoperasian dan Pemasangan
Installation
^ Connect the control cable plug
connectors.
^ Use the extension cable supplied to
extend the length of the connection
cable if necessary.
Equipotential bonding is required if
the control cable is to be extended
by more than the extension cable
supplied (see "Electrical
connection").
^ If required, connect the earth lead to
connection point c in the housing.
Please note: When feeding the cable
and the exhaust ducting through the
substructure of the roof be careful to
ensure that any gaps are sealed
properly afterwards.
16