Miele DA 3466 Petunjuk Pengoperasian dan Pemasangan - Halaman 40
Jelajahi secara online atau unduh pdf Petunjuk Pengoperasian dan Pemasangan untuk Kap Ventilasi Miele DA 3466. Miele DA 3466 48 halaman.
Juga untuk Miele DA 3466: Petunjuk Pengoperasian dan Pemasangan (48 halaman), Petunjuk Pengoperasian dan Pemasangan (48 halaman), Petunjuk Pengoperasian dan Pemasangan (48 halaman), Petunjuk Pengoperasian dan Pemasangan (48 halaman)
Installation
Install the conversion kit as described
in the kit's installation instructions.
Make sure that the slats in the
exhaust grille point toward the center
of the room and not toward a wall or
the ceiling.
Install the charcoal filter (see
"Cleaning and care").
Power supply
Refer to the notes in "Electrical
connection" and "IMPORTANT
SAFETY INSTRUCTIONS" before
connecting to the electricity supply.
Connect the hood to the electrical
supply.
40
Electrical connection
WARNING: TO REDUCE THE RISK
OF FIRE, ELECTRIC SHOCK, OR
INJURY TO PERSONS, OBSERVE
THE FOLLOWING:
All electrical work should be
performed by a qualified electrician
in strict accordance with national
regulations (for USA: ANSI-NFPA 70)
and local safety regulations.
Installation, repairs and other work
by unqualified persons could be
dangerous.
Ensure that power to the appliance is
OFF while installation or repair work
is performed.
Verify that the voltage, load and
circuit rating information found on
the data plate (see "Technical
Service"), match the household
electrical supply before installing the
hood.
Use only with ventilation hood cord-
connection kits that have been
investigated and found acceptable
for use with this model hood.
If there is any question concerning
the electrical connection of this
appliance to your power supply,
please consult a licensed electrician
or call Miele's Technical Service
Department.
WARNING: THIS APPLIANCE MUST
BE GROUNDED