Miele DDG 102 Panduan Pengoperasian dan Instalasi - Halaman 13
Jelajahi secara online atau unduh pdf Panduan Pengoperasian dan Instalasi untuk Kap Ventilasi Miele DDG 102. Miele DDG 102 24 halaman. External motor roof installation
Juga untuk Miele DDG 102: Petunjuk Pengoperasian dan Pemasangan (28 halaman), Panduan Petunjuk Instalasi (28 halaman), Panduan Petunjuk Instalasi (28 halaman)
^ Drill four C 6 mm holes at the
positions you have just marked to a
depth of 30 mm.
^ Press S6 plugs into the drill holes so
that they are flush.
^ Push the motor unit housing into the
wall and secure it in position.
^ Position the telescopic inner section
D so that it protrudes approx. 50 mm
out from the brickwork.
^ Inject insulation foam into the space
between the brickwork and the
housing.
^ Secure stainless steel cover A to the
housing using a crosstip screwdriver.
^ The ducting stub on the motor unit
has a diameter of 150 mm when the
appliance is supplied.
Please fit the adapter supplied if a
diameter of 125 mm is required.
^ Push the flexible ducting onto the
stub on the motor unit and secure it
with a hose clip.
^ Connect the control cable plug
connectors.
^ Use the extension cable supplied to
extend the length of the connection
cable, if necessary.
^ If this is still not long enough, please
refer to the notes in "Electrical
connection".
Installation
13