Miele PUR 98 D Petunjuk Pengoperasian dan Pemasangan - Halaman 30
Jelajahi secara online atau unduh pdf Petunjuk Pengoperasian dan Pemasangan untuk Kap Ventilasi Miele PUR 98 D. Miele PUR 98 D 48 halaman. Ventilation system
Juga untuk Miele PUR 98 D: Petunjuk Pengoperasian dan Pemasangan (40 halaman), Petunjuk Pengoperasian dan Pemasangan (44 halaman), Petunjuk Pengoperasian dan Pemasangan (44 halaman), Manual (48 halaman)
Installation
Use a knife to release the four
spacers and the two covers from the
spacer frame supplied.
Use the spacer frame as a drilling
template. Place it on the ceiling with
the arrows pointing forwards. Using
the notches, align the spacer frame
on the intersecting lines and make
pencil marks for the drill holes.
30
Drill four holes 10 mm, approx. 115
mm deep for the plugs supplied.
Place the four plugs in the holes and
screw in the 4 screws so that they
protrude by approx. 30 mm.