360 Yield 360 Y-DROP NEW HOLLAND Buku Petunjuk - Halaman 3
Jelajahi secara online atau unduh pdf Buku Petunjuk untuk Peralatan Pertanian 360 Yield 360 Y-DROP NEW HOLLAND. 360 Yield 360 Y-DROP NEW HOLLAND 12 halaman.
ESTABLISH
I.
DROP LOCATIONS
Step 1
Locate the center of the machine and
identify the location of all the drops. On
the sprayer boom, mark where each riser
mount will be located. This will ensure
that the extension tubes will not interfere
with the riser mounts.
Figure 1
Step 2
For the primary boom; starting at the
wing fold pivot pin, measure out and
make marks at 48", 108", 168", 244"
and 289" (all measurements are ±5").
Repeat for the other primary boom.
INSTRUCTIONS 360 Y-DROP
48"
108"
168"
244"
289"
Figure 1
360YIELDCENTER.COM
MILLER
NEW HOLLAND
3