Allnet 209437 Panduan Pengguna - Halaman 5

Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Beralih Allnet 209437. Allnet 209437 6 halaman. Industrial unmanaged 8 port gigabit switch with 2x sfp

Allnet 209437 Panduan Pengguna
1.
Put the switch on the surface of a large and stable table, or professional
installation rank mount
2.
Connect Positive, Minus and earth terminals as indicators on the power
adapter.
3.
Connect the Network devices to the switch port though network cable.
NOTE
1.
Please don't put heavy products on the switch, and please ensure good
ventilation environment for the switch.
2.
Please cut off the power first before plugging the power adapter.
POWER
Connect the power cable, plug it into power socket, turn on the power, then the
swich will automatically initialize, and LED lights status will display as following:
1.
Except the RJ45 port lights, all the other lights will go through the process
of "on-off-on-off", which means the system restoration is successful.
2.
Power LED remains lit.
Note
If initialization is inconsistent witch the above, please check the power.
© ALLNET GmbH Computersysteme 2022 – All rights reserved
Errors and changes reserved