ABB ACH580-01 Series Petunjuk Manual - Halaman 3

Jelajahi secara online atau unduh pdf Petunjuk Manual untuk Peralatan Industri ABB ACH580-01 Series. ABB ACH580-01 Series 8 halaman. Base drive replacement
Juga untuk ABB ACH580-01 Series: Manual (16 halaman), Panduan Instalasi dan Start-Up Cepat (17 halaman), Petunjuk Manual (7 halaman), Panduan Instalasi dan Start-Up Cepat (17 halaman), Panduan Instalasi dan Start-Up Cepat (17 halaman)

ABB ACH580-01 Series Petunjuk Manual
REPLACEMENT INSTRUCTIONS | ACH580-01 BXR UL TYPE 1 & 12, R1/R2
Step
Instruction
4
A
Cut zip tie
C
Cut zip tie
by pulling out the terminal block.
NOTE: Remove any additional drive I/O wiring.
5
Using a PZ2 bit, loosen and remove wires from the Input Terminals
of the drive.
Using a PZ2 bit, loosen and remove wires from the Motor Terminals
of the drive.
6
Using a PZ3 bit, loosen and remove ground wire from the drive.
7
Using a T20 bit, loosen and remove six (6) screws securing the
A
flange plate
Save hardware.
B
and remove the CDPI
from drive. Set aside.
and disconnect the RS485 cable
.
Diagram
D
from the drive
A
B
D
C
A
3