Miller XMT 300 CC/TIG Panduan Pemilik - Halaman 13

Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Sistem Pengelasan Miller XMT 300 CC/TIG. Miller XMT 300 CC/TIG 44 halaman.

Miller XMT 300 CC/TIG Panduan Pemilik
3-6.
Installing
Gas
Supply
wam4.1 9/Si
Obtain gas
cylinder
and chain to
running
gear,
wall,
or
other station
ary
support
so
cylinder
cannot
fall
and break off valve.
1
Cap
2
Cylinder
Valve
Remove cap,
stand to side of
valve,
and open valve
slightly.
Gas
flow blows dust and dirt from valve.
Close valve.
3
Cylinder
4
Regulator/Flowmeter
Install
so
face is vertical.
5
Gas Hose Connection
Fitting
has
5/8-18
right-hand
threads. Obtain and install gas
hose.
6
Flow
Adjust
Typical
flow rate is
15
cfh
(cubic
feet
per
hour).
Make
sure
flow
adjust
is closed
when
opening cylinder
to
avoid
damage
to the
flowmeter.
7
GaslnFitting
8
Gas Out
Fithng
The Gas In and
Gas Out
fittings
have
5/8-18
right
hand threads.
Obtain
proper
size,
type,
and
length
hose and make connections
as
follows:
Connect hose from
shielding
gas
supply
regulator/flowmeter
to
Gas
In
fitting.
Connect
shielding
gas hose from
torch
to
Gas Out
fitting.
ssb3.3
5/94
Ref. ST-i
58 697-A/
Ref. S-0004-A
/
Ref.
ST-i
53
625 / Ref.
S-0621
-c
Figure
3-7.
Typical Regulator/Flowmeter
Installation
4~
WARNING
CYLINDERS
can
explode
if
damaged.
BUILDUP
OF
SHIELDING
GAS
can
harm
Keep cylinders
away from
welding
and other
health
or
kill.
electrical circuits.
Shutoff
shielding
gas
supply
when not in
use.
Never touch
cylinder
with
welding
electrode.
~
Always
secure
cylinder
to
running
gear,
wall,
or
other
stationary
support.
2
3
Tools Needed:
~r 5/8,
1-1/8 in
OM-2204
Page
7