Miller 20 Series Panduan Pemilik - Halaman 18

Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Aksesori Pengelasan Miller 20 Series. Miller 20 Series 36 halaman.

Miller 20 Series Panduan Pemilik

5-2. Equipment Connection Diagrams

1
3
2

5-3. 14-Pin Plug, Shielding Gas And Optional Volt Sense Lead

1
2
3
Tools Needed:
5/8, 11/16 in.
OM-281138 Page 14
4
115VAC
4
Contactor
4
1
CV Welding Power Source
With 24 VAC Power
2
CV Welding Power Source
Without 24 VAC Power
3
115 Volts AC /24 Volts AC
Power Adapter
4
14-Pin Control Cord
5
Weld Cable (Required)
6
Work
6
5
6
5
1
Gas Hose With 5/8-18 Right-
hand Thread Fittings
(Customer Supplied)
.
Shielding gas pressure not to
exceed 100 PSI (689 kPa).
2
14 Pin Plug PLG2
Use plug to make connection to
welding power source.
3
Optional Volt Sense Lead
(Part Of Meter Option)
!
Weld voltage is present at
voltage sensing clamp
when wire feeder and weld-
ing power source are on.
This condition exists even if
wire feeder lights and
meters are off.
Turn off wire feeder or weld-
ing power source before
handling or moving voltage
sensing clamp.
Connect to volt sense lead.
4
Power Switch
281202-A