Miller ArcStation Panduan Pemilik - Halaman 19
Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Aksesori Pengelasan Miller ArcStation. Miller ArcStation 44 halaman.
Juga untuk Miller ArcStation: Panduan Pemilik (20 halaman)
E. Connecting End Subframes To Rails And Installing Leveling Feet
Tools Needed:
hex bit 3/16 in.
AA and ZZ
Attention:
If the welding table has a solid top and no optional tool chest, proceed to Subsection J.
If the welding table has a solid top and an optional tool chest, proceed to Subsection H.
If the welding table has an X-pattern top and an optional tool chest, proceed to Subsection G.
If the welding table has an X-pattern top and no optional tool chest, proceed to Subsection F.
F. Installing Dust Tray Rails To Welding Table (Use With An X-pattern Top And No Optional Tool Chest)
Side View
1
AA and ZZ
1/2 in.
Tools Needed:
hex bit 3/16 in.
2
1
1/2 in.
AA and ZZ
AA and ZZ
1
End Subframes
Use eight bolts AA and eight
locknuts ZZ at each angle bracket
as
shown
to
connect
end
subframes and rails.
Tighten all bolts and locknuts.
2
Leveling Foot
Install four leveling feet to bottom of
end subframe tubes.
Do not tighten leveling feet at this
time.
.
Use rails and hardware that
came with the dust tray.
1
Dust Tray Rail
Use four bolts AA and four locknuts
ZZ and install dust tray rails to the
welding table.
Tighten all bolts and locknuts.
Do not install dust tray at this time.
Proceed to Subsection J.
OM-244 997 Page 15