ABB ENTELLIGUARD T Manual - Halaman 9

Jelajahi secara online atau unduh pdf Manual untuk Peralatan Industri ABB ENTELLIGUARD T. ABB ENTELLIGUARD T 17 halaman. Procedure for quality checks of dr iec

MPACT/MPACT PLUS FIXED PART
NOTE
Need to perform the checks described below on Existing fixed part ,Before starting the ASM of Direct replacement cassette,
Please refer to the procedure to assemble all parts related to(1SDH002095A1001-MPACT/MPACT PLUS)
and follow the instructions as per mentioned Instruction sheet document.
Make sure that the previous class of protection remains unchanged. If not, it must be restored.
1..Visually check the rails are in proper condition and no part of it is damaged. Check if they move smoothly or not, apply
grease if necessary.
2. Make sure that there is no dust or carbon residue due to circuit breaker operations as they significantly reduce the
insulation clearance.
3. Check the protective coating of the materials are not damaged, e.g. paint coating on the plates and silver-plating
of conductive parts. Remove traces of oxidation with fine grain sand paper
4. Make sure that the screws on the fixed part are properly tightened, e.g, the screw that join the fixed part to the
switchboard, the ones that fasten the terminals of the fixed part to the switchboard bars and earthing plates.
5. Check the non metallic secondary disconnect part and Front panel are not damaged and no crack is there.
6. Make sure all the moving parts on the bottom of fixed part are properly moving and not getting stuck(Racking system,
CAMS, Front Panel shutter Screw. Apply grease if necessary.
7. Make sure that all indications are working correctly.
Rev. A
1
1
6
5
1 6 7
.
5
6
6
PROCEDURE FOR QUALITY CHECKS OF
DR IEC ENTELLIGUARD G FAMILY
Doc.N°
1SDH00XXXXX
1
Page N°
09/17