ABB EVLunic V2 Panduan Instalasi - Halaman 6

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Peralatan Industri ABB EVLunic V2. ABB EVLunic V2 8 halaman. Pedestal – floor-mounted column

Note
The images are valid for all versions.
Floor-mounted column from below
Anchoring
Grounding point
Document: Rev. 1.00 / Document No.: 90333 │ Date 21.08.2018
Thread in cable
Thread the connection cables from the
bottom through the column upwards
through the cable opening.
Anchoring
Position the column directly over the
cable outlet.
Anchor the column to the foundation
using the 6 hexagon bolts.
Grounding
If necessary, connect the earthing to the
column's grounding point.
|5