Burkert 8644 AirLINE Panduan Memulai Cepat - Halaman 13

Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Sistem Kontrol Burkert 8644 AirLINE. Burkert 8644 AirLINE 17 halaman.

There must be adequate space between valve block and pre-
decessor module > 6 mm.
Detach the modules/terminals from the standard rail according to
the manufacturer's description.
NOTE!
The interface of the left connection module contains elements
which may break off if force is used.
• Never place the valve block on its side and observe the permitted
installation position.
Fig. 9:
Detaching the modules/terminals from the standard rail
NOTE!
• When screwing the valve block back onto the standard rail,
observe a max. torque of 2 Nm!
Type 8644

Installation

7.
INSTALLATION
7.1. Fluid Installation
DANGER!
Risk of injury from high pressure in the equipment!
• Before loosening lines or valves, turn off the pressure and vent
the lines.
• Design the connections with the largest possible volume.
• Close the open connections not required with lock screws.
• The connections for the pilot control exhaust air (x) must not be
sealed.
• Check correct assignment of the connections 1 and 3 or 5. They
may by no means be interchanged.
7.1.1. Pneumatic connections - feed
Fig. 10: Pneumatic Connections
Procedure:
Depending on the version, plug the connections in the corre-
sponding working connections or screw them in.
english
Exhaust air
X channel:
Standard version:
Deaeration of the control valves
Control assist air version:
P connection for control valves
Pressure supply connection
13