Aquapeutics Caribbean Panduan Instalasi - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Kabin Mandi Aquapeutics Caribbean. Aquapeutics Caribbean 17 halaman.
MODEL: Caribbean Installation instructions:
A、Water supply:
Hot and cold water supply lines are half inch NPT pipe thread
Power supply:A 220Volt,13 amp service with GFI is necessary to energize the steam room-spa and a
110 volt 11.8 amp circuit with GFI is needed for the whirlpool bath. Please note: If you have purchased a
Tub with the additional heater option it is very important to understand that the electrical requirements
for your unit have changed. The heater requires a second separate electrical circuit that can supply 13
amps at 110 volts with GFI in addition to what your tub had originally needed.
B、The size of breakers and wire gages needed is determined by local, state and national codes as
interpreted by the installing electrician. The length of the wire going to the steam generator from the
wall should be 5 feet, while the length of the telephone line needed is 7 feet. This allows the unit to be
pulled out from the side walls if maintenance is ever needed.
C、Drainage: The diameter of the drain pipe needs to be at least 2 inches. The position of the drain hole
can be within 6 inches from the hole shown in the drawing on the previous page. It is also very
important that the drain line not have a trap. It must be a straight drain line, as the shower-spa has its
own built in trap for your convenience.
Notes:
(1) The distance from the top of the steam room to the ceiling of the area where it is installed should be
4 inches or greater. (The room should be at least 4 inches taller than the spa.)
(2) It is recommended that the water pressure be at least 43 PSI and both the cold and hot water pressure
should be as equal as possible. If the pressure is lower than required, have your plumber install the
necessary equipment to increase the water supply pressure.
(3) Please have ground fault interrupter (GFI) protection on all power supply lines to the spa.
(4) It is easier to line up all panels with the hardware loose. During initial assembly please attach all
fasteners loosely, then when the unit is completely erected, snug up all bolts and screws.
4