Aquasana AQ-UV-C Series Petunjuk Pengoperasian & Pemasangan - Halaman 6

Jelajahi secara online atau unduh pdf Petunjuk Pengoperasian & Pemasangan untuk Sistem Penyaringan Air Aquasana AQ-UV-C Series. Aquasana AQ-UV-C Series 16 halaman.

Aquasana AQ-UV-C Series Petunjuk Pengoperasian & Pemasangan

Assembly

Unpack the system
and ensure all the
components are included
with the system. Your
system is shipped
with the following
components:

Location

For Point of Entry (POE) systems,
choose a location where the main
cold water line is accessible. Install
the system after other water
treatment equipment (softener or
filters), but before any branches
(See Figure 1). For Point of Use
(POU) systems, install the unit
just before the faucet. Aquasana
recommends that a 5 micron filter
be installed before the UV system
for a final polishing step before the
water is disinfected.
in from
water main
6
Aquasana-HO
CONTROLLER
AQ-UV-C SYSTEMS
AQ-UV-CC
(fits all units)
Rhino
®
Whole House Water Filter
(High output lamp systems)
Figure 1
Recommended POE Installation Location
GLAND NUT
O-RING
UV LAMP
AQ-UV-L330C
"-10" series
AQ-UV-L420C
"-15" series
SLEEVE SPRING
QUARTZ SLEEVE
AQ-UV-Q330
"-10" series
AQ-UV-Q420
"-15" series
REACTOR
POWER CORD
out to hot &
cold water