All electrical work shall be properly performed by a qualified electrician per all applicable codes. Failure to do so may result in severe bodily injury or death.
Hazards exist in confined spaces such as a septic tank. All confined space precautions must be followed if entering a tank. Always keep tank openings covered
during storage and installation
If installing a new blower and/or blower housing, place the blower housing on the original concrete slab. Pass the air supply line and electrical conduit
through the concrete slab from below grade. Run the electrical supply conduit from the control panel to the desired blower location.
REPLACEMENT BLOWER CONNECTION
CONNECT BLOWER PIPING
a.
Longest pipe
b.
Elbow
c.
Air filter assembly
d.
Shortest pipe
e.
Reducer bushing
Introducing harmful or damaging substances into the BioBarrier ® system may void the warranty.
Blower for BioBarrier® 0.5

BLOWER REPLACEMENT

NOTE:
USE TEFLON SEALANT TAPE ON ALL PIPE CONNECTIONS.
1. Secure blower assembly to base using four (4) 14# X 1 ½ " self-tapping screws
(supplied with unit). Drill screws directly into blower base.
2. Connect air line (supplied by contractor) from blower outlet to BioBarrier
using required piping (check unit specs). Blower piping to BioBarrier
(12 m) total length and use a maximum of 4 elbows. ALL CONNECTIONS MUST BE AIR-
TIGHT AND PERMANENT. Keep all debris out of the air line.
3. Wire the blower to accept the proper voltage for your specific location according to the
diagrams of each blower.
may not exceed 40 ft
®
Blower for BioBarrier® 1.0 & 1.
unit airgrid
®