Alpha ESS Storion-T50 Panduan Instalasi - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Penyimpanan Alpha ESS Storion-T50. Alpha ESS Storion-T50 18 halaman. Energy storage system

Alpha ESS Storion-T50 Panduan Instalasi

INSTALLATION

1system: 1 x 4500
1 system: 1 x 4500
mm, 50mm2 Power
mm, 50mm2 Power
Cable,
Cable,
Red-Red, For
Black-Black, For
Junction box -
Junction box- INV
(T50);
INV(T50);
1 system: 1 x 4500
1system: 1 x 4500
mm, 95mm2 Power
mm, 95mm2 Power
Cable,
Cable,
Red-Red, For
Black-Black, For
Junction box-
Junction box -
INV(T100);
INV(T100)
1 cluster: 1 x 4500
1 cluster: 1 x
mm, 35mm2 Power
Communication
Cable,
Cable
Black-Black, For HV
7500 mm EMS-INV
Box - Junction box
1 x Meter with 3 CT
(on-grid mode-DC);
PV Combiner box(If
2 x Meter with 6 CT
applicable)
(on-grid mode
-AC/Hybrid)
1 cluster: 1 x
Communication
Cable
7500 mm EMS-INV
Battery Rack
1 cluster: 1 x 4500
mm, 35mm2 Power
Cable,
Red-Red, For HV Box
– Junction box
System
3*CT (on-grid
mode-DC);
6*CT (on-grid mode
1 x Installation
-AC/Hybrid) Outline
manual
size(W*H*D)
:90*14*40mm
Through size(a*e)
:20*30mm
17
18
1 x Operation and
maintenance
manual
4.3 Installation

4.3.1. PCS Installation

4.3.1.1 Removal
When removing the T50/T100-INV, a forklift can be used to remove the whole case.
Users can lift the device bottom with a forklift or remove the inverter cabinet through
the lifting hole on its top with a crane. It can be transported alone.
4.3.1.2 Operation Space
The installation space of the PCS should have a proper distance from its peripheral walls
so as to ensure that the machine door can be opened and closed conveniently and there
will be sufficient space for module insertion and extraction, normal heat dissipation and
user's operation.
Figure 4-1 Moving method for inverter
Figure 4-2 Installation space
INSTALLATION