Creative Solutions Postal Pro PP200 Petunjuk

Jelajahi secara online atau unduh pdf Petunjuk untuk Peralatan Pos Creative Solutions Postal Pro PP200. Creative Solutions Postal Pro PP200 2 halaman. Post kit
Juga untuk Creative Solutions Postal Pro PP200: Petunjuk (2 halaman)

Creative Solutions Postal Pro PP200 Petunjuk
A.
Vertical Post: 4x4 Square PVC Post – 50.75-inch length
B. Cross Arm: 3.5" x 3.5" PVC – 26-inch length
C. Top Finial Fits on top of Vertical Post
D. End Caps (2) Fits on end of cross arm
Postal Regulations recommend that the floor (mail entry point) of the mounted Mailbox be between 41"-45" above the road surface and that the front of the
mailbox be set back 6-8" from the edge of road or front of curb. The USPS suggests that all customers contact their local Post Office before installing your
Mailbox/Post to ensure correct placement and height at the street.
Install Ground Mounting Post – Not Included
The PP200 Post is designed to slip over a Mounting Post made from a standard 4x4 wooden post (actual dimensions are 3.5 x 3.5.) Two 2x4 boards can be
combined to provide an alternative Mounting Post.
Mounting Post should be set 18 inches in to the ground and between 18-24 inches above ground.
Assemble PP200 Post
1) Slide Cross Arm in to the opening in the Vertical Post. (See Figure 1)
2) Leave 17" of the Cross Arm extending in front (mailbox side) of the Vertical Post.
3) Secure the Cross Arm into place using (2) #12 x 1 Self Drilling Screws where it intersects with Vertical Post. (1 screw on each side) (See Figure 2)
4) (6) Post Cap clips have been included in the hardware kit for installation of End Caps and Top Finial to the Post and Cross Arm. Attach Clips as shown (See
Figures 3 and 4) below with barb side on outside of PVC posts. Use (2) Clips per post end application. NOTE: Clips are to be centered between corners as shown in
pictures. After clips are in place, slip on End Caps and Finial caps for secure installation.
5) You can now slip Assembly over Ground Mounting Post. Use (4) of #12 x 1 Self Drilling Screws with white heads to secure PP200 Assembly to Mounting Post.
Figure 1
Postal Pro PP200 Post Kit - Instructions
P a r t s L i s t
Figure 2
E. Mailbox Mounting Kit
- (4) 10-24 x 1 ¼ length threaded screw
- (4) #8 Self Drill Screw – 1-inch Length
- (6) #12 White Self Drill Screw – 1 inch
Figure 3
- (4) 10-24 Nuts
- (2) Metal U-Brackets
- (6) Post Cap Clips
Figure 4