Cres Cor 121PH Series Petunjuk Pengoperasian dan Pemeliharaan

Jelajahi secara online atau unduh pdf Petunjuk Pengoperasian dan Pemeliharaan untuk Peralatan Makanan Komersial Cres Cor 121PH Series. Cres Cor 121PH Series 4 halaman. Proof/hot cabinets

Cres Cor 121PH Series Petunjuk Pengoperasian dan Pemeliharaan
5925 Heisley Road • Mentor, OH 44060-1833
OPERATING and MAINTENANCE INSTRUCTIONS
Models: 120PH, 121PH and 126 PH Series Proof/Hot Cabinets
Model No.
120, 121PH, 126PH Series
120, 121PH, 126PH Series
w/240 suffix
All are designed for AC service.
HOW TO INSTALL UNIT:
1. Place cabinet near warm ovens. Do NOT put in
drafty areas or near ventilating systems.
2. Plug cord end into proper wall outlet.
3. Fill water pan (following steps a-c)
CAUTION
operation and to maintain warranty.
a. Lift off cover.
b. Fill with 3½ qts. (3.3 liters) of clean, hot water.
Replace cover.
c. Adjust vents on cover to half open.
HOW TO PROOF:
1. Fill water pan (See "How to Install")
2. Push "POWER" switch to "ON." The yellow light
will come on.
3. Push "MODE SELECTION" switch to "PROOF".
The yellow light will come on.
4. Turn "HUMIDITY" dial to No. 8.
5. Turn "AIR" dial to "OFF".
6. Preheat for 30 minutes.
7. Put fresh or fully thawed dough into cabinet.
8. Turn "HUMIDITY THERMOSTAT" to No. 9.
NOTE: The cabinet temperature will drop temperature
inside cabinet if cold dough is added.
Do NOT put frozen dough into cabinet
Call Toll-free: 877-CRES COR (273-7267) • Fax: 800-822-0393 • www.crescor.com
Volts
Watts
120
2000
240
2000
Use of treated or
soft water may be
required for proper
Amps
Hertz
16.6
60
8.6
60
1
2
5
6
4
7
ON
( I )
3
8
2
9
1
10
OFF
( 0 )
OFF
POWER
HUMIDITY
R
CONTROL PANEL PARTS IDENTIFICATION
1. Switch - Power
2. Pilot Light - Power
3. Thermostat - Humidity
4. Thermostat - Air
NOTE: No. 9-10 setting will give you an approximate
temperature of 95°F (35°C), and 90-
95% humidity. Experiment with different
"HUMIDITY" and "AIR" settings to get the
exact temperature and humidity you need. The
thermometer shows the temperature inside the
cabinet.
NOTE: Check water level in water pan if you are
proofing longer than 90 minutes. Fill with
clean, hot water.
Proof/Hot
FL-2212
Cabinets
Rev. 8 (3/12)
Page 1 of 4
Phase
NEMA
1
5-20P
1
6-15P
5
7
5
6
4
7
PROOF
3
8
2
9
1
10
HEAT
OFF
AIR
MODE SELECTION
3
4
6
5. Yellow Light - Proof
6. Red Light - Heat
7. Switch - Mode Selection
8. Thermometer
8