ABB C1900 Series Panduan Instalasi
...3 MECHANICAL INSTALLATION
3.2.1 Wall-/Pipe-Mounting – Fig. 3.4
A – Fitting the Mounting Brackets
1
0.281in Dia.
10in
4
Remove instrument from wall
5
Drill suitable holes for lower bracket
6
Re-hang instrument and fix lower bracket to wall
B – Wall Mounting
Secure using
2
two nuts and
washers
C – Pipe Mounting
Fig. 3.4 Wall-/Pipe Mounting
4
1
1 4
Fix
in – 28 UNF
studs into case
2
Secure mounting
brackets to case
3
Repeat for lower
bracket
Mark fixing centers on wall (2)
and drill suitable holes
2
Hang 'key hole' slots
over screw shanks
3
Mark lower holes
0.281in Dia.
3
2
/
in. (60mm) OD
8
vertical pipe
1
Fit 'U' bolts
into brackets
3.2.2 Panel Mounting – Fig. 3.5
Dimensions in inches (mm)
2
Mark four mounting holes
14.00 (355.6)
12.72 (323.08)
14.19
(360.4)
1.70
(43.2)
0.6 (16.25)
3
Drill four suitable holes
5
Secure in panel using
four bolts and washers
Fig. 3.5 Panel Mounting
4 holes 0.281 dia.
1
or tap for
in thread
4
11.25
12.72
(285.8)
(323.1)
1
Cut hole in panel
Optional
gasket
4
Locate instrument
in cut-out