ABB SACE Emax 2 Manual - Halaman 10

Jelajahi secara online atau unduh pdf Manual untuk Alat Ukur ABB SACE Emax 2. ABB SACE Emax 2 13 halaman. With aeg me1257-me2007-me2507-me3207 plug-in air circuit-breakers
Juga untuk ABB SACE Emax 2: Manual (5 halaman), Manual (7 halaman), Manual (6 halaman), Manual (6 halaman), Manual (5 halaman), Manual (4 halaman), Manual (4 halaman), Manual (6 halaman), Manual (4 halaman), Manual (7 halaman), Manual (6 halaman), Panduan Pengguna (10 halaman), Manual (15 halaman), Manual (4 halaman), Manual (6 halaman), Manual (5 halaman), Manual (15 halaman), Manual (4 halaman), Manual (12 halaman), Petunjuk Pemasangan (20 halaman), Manual (18 halaman), Panduan Pemilik (20 halaman), Manual (16 halaman), Panduan Memulai Cepat (7 halaman), Pemasangan (8 halaman), Manual (11 halaman), Penggantian (16 halaman), Manual (14 halaman), Panduan Pengguna (14 halaman), Panduan Memulai Cepat (5 halaman), Panduan Pengoperasian Awal (8 halaman), Manual (4 halaman), Manual (9 halaman), Manual Perkuatan (16 halaman), Manual (11 halaman), Manual Perkuatan (10 halaman)

ABB SACE Emax 2 Manual
Y4
Y8
REGOLAZIONE:
N.B. Nelle regolazioni quando si agisce sui dadi non far ruotare su sé stessi i
puntali dei cavi
1
Inserire le parti mobili nelle parti fisse (se estraibili) e sganciare le molle
2
Chiudere l'interruttore ''CB1''
3.1 Tirare i cavi ''Y2'' degli interruttori chiusi verso il basso fino a portare i
tiranti ''Y4'' degli interruttori aperti in battuta sul piano ''Y3''
3.2 Bloccare il grano M4 ''Y1'' (1,5 Nm / 13.3 lb in) e chiudere il relativo
controdado ''Y5'' (1.5 Nm / 13.3 lb in)
4
Aprire l'interruttore ''CB1''
5
Chiudere l'interruttore ''CB2'' e ripetere i punti 3.1 e 3.2
6
Aprire l'interruttore ''CB2''
7
Chiudere l'interruttore ''CB3'' e ripetere i punti 3.1 e 3.2
8
Aprire l'interruttore ''CB3''
9
Eseguire alcune manovre di chiusura e apertura, quindi verificare la
battuta dei tiranti ''Y4'' sul piano ''Y3''
10
Aprire gli interruttori chiusi e riagganciare le molle
11
Chiudere l'interruttore ''CB3'' e caricare le molle di chiusura
dell'interruttore ''CB1''e dell'interruttore ''CB2''.
12
Muovere in direzione verticale la slitta ''Y8'' dell'interrutore ''CB1'' fino a
portare il segnalatore ''Y6'' centrato nella finestra.
Se necessario, è possibile modificare la quota 22 (0.86") agendo sui dadi
''Y7'' rispettando i valori min. e max. indicati
13
Ribloccare i dadi ''Y7'' (3 Nm / 26.5 lb-in)
14
Ripetere i punti 2 e 3 operando su ''CB2'' anziché su ''CB1''
15
Aprire l'interruttore ''CB3'' e caricare le molle di chiusura.
16
Chiudere l'interruttore ''CB1'' e ripetere i punti 2 e 3 sulla slitta ''Y8'' di
''CB3'' e ''CB2''
17
Aprire l'interruttore ''CB1''
18
Chiudere l'interruttore ''CB2'' e ripetere i punti 2 e 3 sulla slitta 'Y8'' di
''CB3'' e ''CB1''
19
Aprire l'interruttore ''CB2''. Chiudere e riaprire l'interruttore ''CB3''
e ''CB1'' per scaricare le molle
20
Eseguire alcune manovre di chiusura e apertura, quindi verificare la
battuta dei tiranti ''Y4'' sul piano ''Y3''
22 (min. 21 - max. 22.5)
Y3
0.86" (min. 0.83" - max. 0.89)
Y7
Y3
Y4
ADJUSTMENT:
NOTE: During adjustments, do not allow the cable terminals to rotate
when working on the nuts
1
Insert the moving parts into the fixed parts (if withdrawable) and release
the springs
2
Close the circuit-breaker ''CB1''
3.1 Pull the cables ''Y2'' of the closed circuit-breakers downwards and bring
the tie-rods ''Y4'' of the open circuit-breakers to touch the surface ''Y3''
3.2 Lock the grub screw M4 ''Y1'' (1.5 Nm / 13.3 lb in) and close the
corresponding lock nut ''Y5'' (1.5 Nm / 13.3 lb in)
4
Open circuit breaker ''CB1''
5
Close circuit-breaker ''CB2'' and repeat steps 3.1 and 3.2
6
Open circuit breaker ''CB2''
7
Close circuit-breaker ''CB3'' and repeat steps 3.1 and 3.2
8
Open circuit breaker ''CB3''
9
Open and close a few times, then make sure that the tie-rods ''Y4'' touch
lightly against the surface ''Y3''
10
Open closed circuit-breakers and hook up the springs again
11
Close the circuit-breaker ''CB3'' and charge the closing springs of
breakers ''CB1'' and ''CB2''.
12
Move slide ''Y8'' of the circuit-breaker ''CB1'' in vertical direction until the
indicator ''Y6'' is centered in the window. If necessary, it is possible to
adjust dimension 22 (0.86") operating on nuts ''Y7'' within the min. and
max. values shown.
13
Retighten nuts ''Y7'' (3 Nm / 26.5 lb-in).
14
Repeat points 2 and 3 operating on ''CB2'' instead of CB1''.
15
Open circuit breaker ''CB3'' and charge the closing springs.
16
Close breaker ''CB1'' and repeat points 2 and 3 for slide ''Y8'' of ''CB3''
and ''CB2''.
17
Open circuit breaker ''CB1'
18
Close breaker ''CB2'' and repeat points 2 and 3 for slide ''Y8'' of ''CB3''
and ''CB1''.
19
Open breaker ''CB2''. Close and re-open breakers ''CB3'' and ''CB1'' to
discharge the springs.
20
Perform a few opening and closing operations, than check that the tie
rods ''Y4'' are touching against the surface ''Y3''.
Y6