Cisco 3750G - Catalyst Integrated Wireless LAN Controller Panduan Memulai - Halaman 26

Jelajahi secara online atau unduh pdf Panduan Memulai untuk Beralih Cisco 3750G - Catalyst Integrated Wireless LAN Controller. Cisco 3750G - Catalyst Integrated Wireless LAN Controller 49 halaman. Integrated wireless lan controller switch
Juga untuk Cisco 3750G - Catalyst Integrated Wireless LAN Controller: Panduan Konfigurasi (40 halaman)

Cisco 3750G - Catalyst Integrated Wireless LAN Controller Panduan Memulai

Before You Begin

When determining where to install the switch, verify that these guidelines are met:
• Airflow around the switch and through the
vents is unrestricted.
• Temperature around the switch does not
exceed 113°F (45°C).
• Humidity around the switch does not exceed
85 percent.
• Altitude at the installation site is not greater
than 10,000 feet.
• Clearance to the switch front and rear panels
meets these conditions:
Front-panel LEDs can be easily read.
Access to ports is sufficient for
unrestricted cabling.
AC power cord can reach from the
AC power outlet to the connector on the
switch rear panel.
Access to the rear of the rack is sufficient
for connecting StackWise cables to
stacked switches.
26
• Cabling is away from sources of electrical
noise, such as radios, power lines, and
fluorescent lighting fixtures.
• For 10/100/1000 ports, the cable length from
a switch to an attached device cannot exceed
328 feet (100 meters).
• For cable lengths for small form-factor
pluggable (SFP) modules, see the
documentation that shipped with the module.