Cisco 4900M - Catalyst Switch Panduan Instalasi - Halaman 6

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Beralih Cisco 4900M - Catalyst Switch. Cisco 4900M - Catalyst Switch 8 halaman. 10/100base-t
Juga untuk Cisco 4900M - Catalyst Switch: Panduan Pemecahan Masalah (6 halaman)

Cisco 4900M - Catalyst Switch Panduan Instalasi
Cable PN 804-182-01
Hub (Port 2) to User Computer
Cable PN 804-182-00
Hub (Port 3) to Test Computer
Cable PN 804-183-00
Hub (Port 6) to Outside Network
Installing 10/100Base-T Cabling
6
This section explains how to install the 10/100Base-T hub cables.
1) Connect the existing power cord to the input connector at the rear of the
10/100Base-T hub.
2) Connect cable pn 804-182-00 (RJ-45 connector) to hub port 3.
3) Connect cable pn 804-182-01 (RJ-45 connector) to hub port 2.
4) Connect cable pn 804-183-00 (RJ-45 connector) to hub port 8.
5) Move cable pn 804-182-00 from test computer ethernet port 1 to ethernet
port 2 (directly above port 1). See
If user computer is an Ultra 1, skip to step 7.
6) If user computer is an SS5, detach cable pn 804-182-01 from the primary
ethernet port and reconnect it to the secondary ethernet board.
7) Route cable pn 804-183-00 from hub port 8 outside of the mainframe
through the cable clamp holding the existing computer cables. These
include power, serial and ethernet cables.
8) Plug cable pn 804-183-00 into the external network connection.
Screws (4x)
10/100Base-T Hub
Plate
Power Cord
to Main Vault J6
Mounting Plate
10/100Base-T Hub Mounting Assembly
10/100Base-T Hub
Cabling.
Catalyst 10/100Base-T Ethernet Hub Upgrade