Cisco Catalyst 2960-X Panduan Pemasangan Perangkat Keras - Halaman 23
Jelajahi secara online atau unduh pdf Panduan Pemasangan Perangkat Keras untuk Beralih Cisco Catalyst 2960-X. Cisco Catalyst 2960-X 34 halaman.
Juga untuk Cisco Catalyst 2960-X: Panduan Memulai (25 halaman), Manual Perangkat Keras (20 halaman)
Switch Installation
Procedure
Step 1
Remove the dust covers from the FlexStack cables, and store them for future use.
Step 2
Do one of the following:
• To connect two FlexStack-Extended Fiber modules, insert one end of the FlexStack cable into the SFP+
module port of the first switch and the other end of the cable into the SFP+ module port on the other
switch.
• To connect two FlexStack-Extended Hybrid modules, insert the FlextStack-Plus cable connectors into
the copper FlexStack-Plus ports and the fiber module connectors into the SFP+ module ports on the
switches.
OL-28309-02
Connecting FlexStack-Extended modules (Optional)
Catalyst 2960-X and 2960-XR Switch Hardware Installation Guide
23