Siemens SIWAREX R Panduan Petunjuk Pengoperasian - Halaman 18
Jelajahi secara online atau unduh pdf Panduan Petunjuk Pengoperasian untuk Peralatan Industri Siemens SIWAREX R. Siemens SIWAREX R 38 halaman. Mounting units for sb series
Juga untuk Siemens SIWAREX R: Panduan Petunjuk Pengoperasian (34 halaman)
Revision 09/04
6. Setting the overload protection:
•
Load the loading platform with the
maximum applicable load.
•
Set the overload protection
mechanism (7) in connection with the
nut (6) to 0.05 - 0,1 mm, see
dimension X in Fig. 2-3
•
Dimension X must exist after
tightening the nut (6) as well.
DANGER
Contaminated, icy or incorrectly set overload protection will create blockages
which cause incorrect measurements or can cause injury or damage to the
machinery by overloading the scale.
2.3
Technical Data
2.3.1 Function Data
Rated load
Permitted transverse movement
Document No.: A5E00353789B
Fig. 2-3 Setting the overload
protection
0.5 t - 5 t
± 4 mm
Elastomer bearing
Page 18