Siemens SIWAREX WL230 BB-S SA Manual - Halaman 19
Jelajahi secara online atau unduh pdf Manual untuk Peralatan Industri Siemens SIWAREX WL230 BB-S SA. Siemens SIWAREX WL230 BB-S SA 36 halaman. Base plate and elastomer bearing bb-s sa
Juga untuk Siemens SIWAREX WL230 BB-S SA: Panduan Petunjuk Pengoperasian (48 halaman), Panduan Peralatan (50 halaman), Panduan Petunjuk Pengoperasian (44 halaman)
Depending on the installation conditions, the detailed procedure deviates from the following
description.
5.3
Mounting the load foot
Introduction
In this section, you will learn how to mount the load foot step-by-step.
Before you start, note the following safety information:
● General safety information (Page 7)
● Basic safety information: Installation (Page 17)
For optimum performance of the load foot, read the complete equipment manual.
Procedure
1. Check the scope of delivery for the load foot:
Check the scope of delivery (Page 20)
2. Create a bracket plate.
Create bracket plate (Page 21)
3. Screw the load cell to the load bearing implement upside down.
Screw the load cell to the load bearing implement. (Page 22)
4. Install the load foot in the load cell.
Installing the load foot in the load cell (Page 23)
5. Compensate for the differences in height:
Compensating differences in height (Page 24)
6. Check the mounting.
Checking the mounting (Page 24)
7. Fasten the grounding cable.
Screw on the grounding cable (Page 25)
SB-S CA
Manual, 06/2019, A5E47600142-AA
Installing/mounting
5.3 Mounting the load foot
19