Siemens TPS3G09 Panduan Pengguna - Halaman 5

Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Peralatan Industri Siemens TPS3G09. Siemens TPS3G09 8 halaman.

NOTICE
CONDUCTING DIELECTRIC AND/OR
HI-POTENTIAL TESTING WILL CAUSE
INTERNAL DAMAGE TO TPS3 UNIT.
Do not perform dielectric or high potential
tests with the TPS3 unit installed.
TPS3 09 Installation Instructions
Pre-Plan your installation. You need to accomplish the
following:
Meet all National and Local codes (NEC
UL 1449 address SPDs).
Confirm System voltage to SPD voltage (120V SPD will
fail instantly on 240V, 277V, etc.).
Mount SPD as close to panel or equipment as possible
to keep leads short (long leads hurt performance
substantially).
Ensure leads are as short and straight as possible,
including neutral and ground. If using a breaker, use a
breaker position that is close to the SPD and the panel's
neutral & ground.
If using a breaker, recommended breaker size is 30A
due to 10 AWG conductor.
Make sure system is grounded per NEC
faults before energizing SPD (inadvertent system problem
may fail SPD).
Never Hi-Pot test Any SPD (will prematurely fail SPD).
Do not install the TPS3 09 through the bottom of a
NEMA 3R panel. Dripping water will prematurely fail the
SPD
(a sealed pipe nipple installed in the SPD may be a
solution).
1. Use voltmeter to check voltages and ensure correct SPD.
See Data Sheet for specs & wire-outs.
2. Determine Mounting location – weather resistant
equipment may be required.
3. If SPD has optional Dry Contact and Flush Mount Kit,
pre-plan their installation. See Figures 4 & 6. (If flush
mounting, be careful to not drop SPD into wall).
4. Remove power from panel/source. Confirm panel/source is
deenergized.
5. Identify breaker location and SPD location. Position SPD
such that LEDs are best visible.
6. Mount SPD – weather resistant applications require
additional sealing, o-rings, etc. (not included).
- Remove an appropriately sized knockout from panel.
- Connect conductors as appropriate – short and straight as
possible (Hi-Legs are Phase B).
7. Label or mark conductors as appropriate (neutral: white,
ground: green, energized: black, hi-leg: orange).
8. Make sure system is bonded per NEC
hazards or faults before energizing (N-G bonding not per
NEC
will fail SPDs: #1 cause of SPD failures).
®
9. Energize and confirm proper operation of green LED
indicators and/or options.
Figure 3: Panel Installation
Article 285 and
®
and clear of
®
Figure 4: Typical Flush Mount Installation
Flush Mount Kit Screws
(8 Provided)
Mounting Screws
(4 Places, Not Provided)
Figure 5: Lead Lengths
Leads: Short & Straight
Cut Excess; Do Not Coil or Loop
Not
and is clear of
®
Good
Good
V DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep Out.
Qualified personnel only.
Disconnect and lock off all power before
working on this equipment.
To Protected Loads
B
C
A
BREAKER
N
G
Flush Mount Plate
Removed Material
• Use closest breaker to SPD
• Locate SPD close to
intended breaker
• Keep Leads Short as
Possible
• Avoid Sharp Bends
Mounting Surface
Hex Standoff
(4 Provided)
SPD
Phase,Ground,
Neutral Wires
Cut Off
Excess Length
Do Not Loop
Or Coil
Short & Straight
3