Cisco N540X-6Z18G-SYS-A Mempersiapkan Instalasi - Halaman 9

Jelajahi secara online atau unduh pdf Mempersiapkan Instalasi untuk Router Jaringan Cisco N540X-6Z18G-SYS-A. Cisco N540X-6Z18G-SYS-A 14 halaman.
Juga untuk Cisco N540X-6Z18G-SYS-A: Manual (30 halaman)

Cisco N540X-6Z18G-SYS-A Mempersiapkan Instalasi
Prepare for Installation

Prepare Your Location

This section illustrates how the building that houses the chassis must be properly grounded to the earth ground.
Figure 5: Building with Rack Room Connected to Earth Ground

Prepare Yourself

This section illustrates how to prepare yourself before removing the chassis from the sealed antistatic bag.
The figures show how to wear the ESD strap around the wrist and how to connect the other end of the strap
to the ground. ESD wrist straps are the primary means of controlling static charge on personnel.
Note: These images are for only representation purposes. The chassis' actual appearance and size would vary.
Prepare Your Location
Prepare for Installation
9