Cisco TelePresence IX5200 Panduan Instalasi - Halaman 3
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Sistem Konferensi Cisco TelePresence IX5200. Cisco TelePresence IX5200 36 halaman.
Juga untuk Cisco TelePresence IX5200: Panduan Pengguna Mulai Cepat (15 halaman), Panduan Pengguna (26 halaman), Pengaturan Pertama Kali (40 halaman)
Cisco IX5000 and IX5200 Installation Guide
1.
Move material and unpack (2 people required)
2. Install the lower display frames (2 people required)
3. (Systems that include seismic brackets only) measure, drill for, and install the seismic brackets (see the "Installing the Seismic
Bracket" chapter on page C-1) (2 people required). Note that this step adds extra time to the installation.
4. Install the upper display frames (2 people required)
5. Install the cable runner
6. Install the upper crossbars, rear kick plates, and toe caps
7.
Install the codecs, PDUs, subwoofer, speakers, and optional endpoint switches into the endpoint structure
Note: The switches in the endpoint structure are optional items. The switches in the table legs to connect the Touch 10 device(s)
are required for the Touch 10 device(s).
8. Install the table legs and electronic equipment (Ethernet/power modules for table legs, microphone connector (MC), PoE switch)
for the front row table, and begin cabling procedures for the table (2 people required for some steps)
9. Perform cable routing for all installed equipment (codecs, PDUs, subwoofer, and speakers for the endpoint structure, and power/
laptop connectivity and PDUs for the table legs) AND place the cables for the light panels and camera
10. Install the displays, light panels, and camera, including cabling
11. Install the front kick plates and toe caps
12. Installl the front row tabletops (2 people required)
13. Install and cable the microphone bars, mute buttons, retractors/presentation cables
14. (IX5200 systems only) install and cable the second row table (2 people required for some steps)
15. Install the PET, fascias, display trim and thermoformed outer panels (2 people required)
16. Install software, register endpoint to Unified CM, perform first-time setup, run test calls
17. Room cleanup
Installation Quick Reference
Page 1-3
© 2015 Cisco Systems, Inc. All rights reserved.