Cisco Catalyst 8300 Series Panduan Pemasangan Perangkat Keras - Halaman 19
Jelajahi secara online atau unduh pdf Panduan Pemasangan Perangkat Keras untuk Perangkat Keras Jaringan Cisco Catalyst 8300 Series. Cisco Catalyst 8300 Series 46 halaman. Edge ucpe
Install the Cisco Catalyst 8300 Series Edge uCPE
•
•
•
•
Unpacking the Device
The device, accessory kit, publications, and any optional units may be shipped in more than one container.
When you unpack the containers, check the packing list to ensure that you have received all the items on the
list.
Only unpack the product when you are ready to install it. This will help prevent accidental damage.
Installing the Cisco Catalyst 8300 Series Edge uCPE
If not already installed, the DIMMs must be installed before rack-mounting the chassis.
Desktop-Mounting the Chassis
The Catalyst 8300 uCPE has circular markings on the bottom of the chassis for rubber feet. Apply the rubber
feet when installing the router on horizontal surface (desk or shelf).
Figure 1. Desktop-mounting the chassis
Unpacking the Device, on page 15
Installing the Cisco Catalyst 8300 Series Edge uCPE, on page 15
Grounding the Chassis, on page 25
Initial Server Setup, on page 26
C H A P T E R
Cisco Catalyst 8300 Series Edge uCPE Hardware Installation Guide
3
15